DOWNLOAD
Download Center
Public Notice of Acceptance for Soil and Water Conservation Facilities – West Side Kindergarten Project, Xiangshe Lake
发布时间: 2024-07-22 15:11:51.000
According to the “Notice of the Ministry of Water Resources on Strengthening Mid‑ and Post‑Event Supervision and Standardizing the Self‑Acceptance of Soil and Water Conservation Facilities for Production and Construction Projects” (Shui Bao… [2017] No. 365), and the “Notice of the General Office of the Ministry of Water Resources on Issuing the ‘Procedures for Self‑Verification of Soil and Water Conservation Facilities in Production and Construction Projects (Trial)’” ( Water conservation work In accordance with the provisions and requirements of Document No. 133 [2018] and the “Administrative Measures for Soil and Water Conservation of Production and Construction Projects in Jiangsu Province” (Document No. 8 [2021] of the Jiangsu Provincial Department of Water Resources), 202 4 year 7 month 22 Day, Xiangshe Lake Kindergarten, Taixing City In The on-site host convened a meeting. Champs-Élysées Lake West Side Kindergarten Project Completion and Acceptance Meeting for Soil and Water Conservation Facilities.
The results of this acceptance inspection are hereby reported for the soil and water conservation facilities of the production and construction project. Certificate of Appraisal The official website of the preparing entity has made it publicly available; please refer to the attachment.
Contact: Engineer Zhao 13382071119
Keywords:
File Download
-
6.1MB
Contact phone number
Contact Address
Hantang Road, Industrial Concentration Zone, Dongping Town, Lishui District, Nanjing City
Copyright ©Nanjing Lengde Energy-Saving Technology Co., Ltd.
SEO Tag NavigationTechnical Support:China Enterprise DynamicsNanjing